• Bahia Vista

    The current Bahia Vista campus was built in 2005-06 to replace the original 1966 school. There are three buildings on site, two of which are two-story buildings connected by covered walkways with stairwells and the third building is a multi purpose/cafeteria building with attached kitchen. The campus received approximately $24 million from the 2002 bond and modernization funds.


    A shade structure was added in summer 2017 as part of 2015's Measure B at a cost of $150,000.